Inside
During
the winter, a hibiscus blooms in the studio
The
bedroom floor
The
tile floor consists of five rooms. This project took eight years to complete.
Had I known that it would take that long, I probably would have had second
thoughts about doing such an elaborate floor
The
dining area
The
kitchen area
Amaryllis
bloom in the kitchen nook during January
A
tile frieze in the bathroom
Stenciled
floor on the landing at the entry to the studio
Tile
floor adjacent to the dining area
Tile floor adjacent to the living area
The
living area, also known as The Moroccan Lounge